Reorder point calculator

Enter daily sales and supplier lead time and see the stock level at which to reorder, with safety stock.

Runs in your browser — your data never leaves your device. Free, no sign-up.

Sales and supplier

Std dev of the lead time. 0 if the supplier always arrives on time.

%

Work it out from my sales

Separate with spaces, commas or new lines. Include days with zero sales. 28+ days gives a fair estimate.

How it was worked out

Other service levels

Rule-of-thumb check: max minus average

Simple, but it usually holds more stock than the formula above because it plans for your worst day and your slowest delivery at the same time.

How to use it

  1. Enter your sales

    Type the average units you sell a day and how much that swings (the standard deviation). Not sure? Paste a few weeks of daily sales and the tool works both out.

  2. Enter the supplier

    Add the lead time — days from placing an order to having stock on the shelf — and, if deliveries are unreliable, how many days that varies by.

  3. Pick a service level

    Choose how often you want to avoid running out during a lead time (95% is a common start). Reorder when stock falls to the reorder point shown.

Worked example

A pharmacy sells on average 12 boxes of a pain reliever a day, with a standard deviation of 4. The wholesaler delivers in 7 days. They want a 95% service level (z = 1.645).

StepWorkingResult
Sales during the lead time12 × 784
Safety stock1.645 × 4 × √7 = 1.645 × 10.5817.4 → 18
Reorder point84 + 17.4 = 101.4102 boxes
If deliveries vary by ±2 days1.645 × √(7 × 4² + 12² × 2²) = 1.645 × √688safety 43.1 → reorder at 128

The unreliable supplier more than doubles the safety stock — a reason to measure lead times, not just sales. These are the defaults above, so you can change one number at a time and watch the result move.

Questions people ask

What is a reorder point?
It is the stock level at which you place the next order. It covers the sales you expect while you wait for the delivery (daily sales × lead time) plus a safety stock for busier-than-usual days. When the shelf count drops to that number, order.
How is safety stock calculated?
This calculator uses the standard formula: safety stock = z × √(lead time × σ² + daily sales² × σLT²), where σ is the day-to-day variation in sales, σLT is the variation in lead time and z comes from your service level (1.645 for 95%). If your supplier is always on time, the second part is zero and it becomes z × σ × √(lead time).
What service level should I choose?
Service level is the chance of NOT running out during one lead time. 90–95% suits most everyday items; 98–99% suits best-sellers that customers will walk out over. Each step up costs more stock: going from 95% to 99% raises z from 1.645 to 2.326, about 41% more safety stock.
I don’t know the standard deviation of my sales. What do I do?
Paste your daily sales for the last 4–8 weeks into the “Work it out from my sales” box (one number per day, including zero days) and press “Use these”. If you have no history, the “max minus average” method below the result needs only your busiest day and your longest wait.
What is the review period?
If you only check stock and order on fixed days — say every Monday — stock has to last until the next check as well as the delivery. Enter the days between checks as the review period. Leave it at 0 if you watch stock all the time.

Do this automatically for every sale

RushFlow keeps live stock for every branch and shows which products have fallen to their stock alert, so you reorder the right things at the right time.

In RushFlow, type the reorder point into a product’s “Stock alert” field and you get a low-stock warning when it is reached.

Get Shop Owner Tips by email

Occasional, practical guides for running a shop — stock, pricing, tax and staff. Optional: the tool above works without it.

Only the email address you type in this box is sent to us — never what you entered in the tool. See our privacy policy.